Linear scheduling integration in a
CPM network
Synchro Professional
2012 Construction CPM Conference At-A-Glance
our program continues to be refined and is subject to
change without notice
January 20 FRIDAY | |||||||
Fri 1pm-9pm | Conference Office is OPEN in Macaw 1 | ||||||
Fri 9am-4pm | Second Annual PMA Netpoint User Conference - in Peacock & Pelican Meeting Rooms | ||||||
January 21 SATURDAY | |||||||
Sat 8am-6pm | EnProMaC / Construction CPM Pre-Conference Outing to Universal Studios - (additional fee) | ||||||
Sat 8am-5pm | ASTA Powerproject Training - in Dove Meeting Room - (additional fees may apply) | ||||||
Sat 830-12 noon | Second Annual PMA Netpoint User Conference - A Deep Dive in the Graphical Path Method (GPM) with Dr. Gui - (additional fees may apply) | ||||||
Sat 3pm-9pm |
Registration at Conference Main Registration Desk |
||||||
Sat 5pm-7pm | Conference Exhibitor Setup | ||||||
Sat 7pm-10pm |
Welcome Reception Sponsored by Oracle® - Swan Terrace - (We hope it is warmer this year!) |
||||||
January 22 SUNDAY |
Swan Salon 6 or as noted |
Swan Salon 5 or as noted |
Osprey 1 | Osprey 2 | Mockingbird 1 | Toucan 1 | Toucan 2 |
Sun 6am-6pm |
Registration at Conference Main Registration Desk 6am - 6pm, at Macaw 1 Conference Office off hours (call posted phone number) |
||||||
Sun 630-800 | Swan 7 - 10 - Breakfast is Being Served - Proudly Sponsored by ... TBD | ||||||
Sun 630-450 | Exhibit Tables, AACE Bookstore, and Internet Cafe are Open | ||||||
Sun 800-915 |
Visions of the Future of CPM Scheduling Dick Faris, P.E. - Oracle Primavera |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
|
Sun 915-945 | Coffee Break Proudly Sponsored by ... TBD | ||||||
Sun 945-1100 |
Introduction to Deltek Open Plan Schedule & Risk Analysis |
Introduction to Microsoft Project 2010 |
Introduction to Oracle’s Primavera P6 R8 Enterprise Project Portfolio Management |
Introduction to
Synchro Professional
|
Introduction to Phoenix Project Manager |
Industry Trends Noted in CPM in Construction Management 7th Edition |
Scheduling, Fast and Slow
|
Sun 945-450 |
Oracle Primavera One-on-One Clinic Macaw 2 - Sign up for your 20 minute session with a Primavera Oracle Specialist |
||||||
Sun 1100-1110 | Free Float | ||||||
Sun 1110-1225 |
Intro to Oracle’s Primavera Risk Analysis (aka Pertmaster) |
Microsoft Project 2010 Advanced Issues for Construction Users |
Practical Use of Oracle’s Primavera
P6 EPPM Download to 1st Report |
Running a Successful Consulting Practice in Challenging
Times by Mike Stone |
Should Schedulers be Certified? by Pat Weaver |
Introduction to Asta Powerproject |
CPM to GPM Easing the Transition |
Sun 1225-200 |
Swan 7 - 10 - Tech Society Lunch is Being Served -
Proudly Sponsored by Microdesk Remarks by AACE, PMI SCoP, Planning Planet |
||||||
Sun 200-315 | Introduction to Acumen Fuse Schedule Analysis Software |
Critical Path 2.0 by Eric Uyttewaal, PMP Microsoft MVP for Project |
Practical Use of Oracle’s Primavera P6 EPPM NTP to 1st Update Report |
Introduction to Micro Planner Software |
PMI Scheduling Community of Practice SEI Town Hall #1 |
Linear scheduling integration in a
CPM network |
Schedule Integration on a Mega-Project |
Sun 315-335 | Ice Tea Break Proudly Sponsored by The CPM Guru Mike Stone | ||||||
Sun 335-450 |
U.S. Army Corps of Engineers Guide Specification on CPM by Jeff Huneycutt |
Writing the Narrative for Initial CPM and Updates by Delbert Bearden, PSP |
Overview of P6 R8 Risk Module by Brian Criss |
ADM v PDM Micro Planner is versatile in both |
The CIOB Initiative An International Strategy for Improved Time Management on Complex Projects |
Power-Using Schedule Analyzer Software by Ron Winter |
Multi-Objective Optimization Model for Scheduling of Construction Projects |
Sun 450-630 | Networking Reception Proudly Sponsored by Synchro Professional - Swan Terrace | ||||||
Sun 630-1000 | Dine on Your Own - or - Dine with Your Five New Friends™ | ||||||
Smoke & Mirrors Reception - Dolphin Cigar Bar - Sponsored by Schedule Analyzer Software | |||||||
Sun 10-Midnite | One Last Drink Networking Event - ESPN Club at Disney's Boardwalk - Sponsored by Synchro Professional | ||||||
January 23 MONDAY |
Swan Salon 6 or as noted |
Swan Salon 5 or as noted |
Osprey 1 | Osprey 2 | Mockingbird 1 | Toucan 1 | Toucan 2 |
Mon 7am-5pm | Registration at Conference Main Registration Desk 6am - 6pm, at Macaw 1 Conference Office off hours (call posted phone number) | ||||||
Mon 630-800 | Swan 7 - 10 - Breakfast is Being Served - Proudly Sponsored by ... TBD | ||||||
Mon 630-450 | Exhibit Tables, AACE Bookstore, and Internet Cafe are Open | ||||||
Mon 800-915 |
The Business of a Planning & Scheduling Firm Dr. Patricia D. Galloway, P.E. CEO - Pegasus Global Holdings, Inc. |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
|
Mon 915-945 | Coffee Break Proudly Sponsored by Critigen | ||||||
Mon 945-1100 |
Litigation Track Tips for Forensic Experts |
Humphreys on EVM | Optimizing P6 8.1 with Critigen's Primavera EPPM Cloud Subscription Solution. |
Acumen Fuse Schedule Analysis Case Study |
Hospital Construction with Virtual Construction
and Location-based Scheduling
|
Introduction to PMA Netpoint Software Facilitating an Electronic Interactive Full Wall |
Introduction to Oracle’s Primavera P3 Project Planner
Software for Historical & Legacy Use |
Mon 945-450 |
Oracle Primavera One-on-One Clinic Macaw 2 - Sign up for your 25 minute session with a Primavera Oracle Specialist |
||||||
Mon 1100-1110 | Free Float | ||||||
Mon 1110-1225 |
The Streamlined Expert Report by Kenji Hoshino |
Applying Earned Value on Small and Large Projects by Pradip Mehta |
Using the Measured Mile to Increase Calculated Delay Quantum by Glen Palmer |
RDCPM® in
Oracle’s Primavera Risk Analysis (aka Pertmaster) |
Schedule Planning and Production Control in Vico
Office
|
Managing LightRail Projects with a Lightweight Team | Bridging from Oracle’s Primavera P3 to P6 |
Mon 1225-200 |
Swan 7 - 10 - Vendor User Group Lunch is Being Served -
Proudly Sponsored by DRMcNatty & Associates Remarks by OPSIG, MPUG, ... |
||||||
Mon 200-315 |
Past Present Future Status of RP-29 |
Introduction to Deltek COBRA |
Real-Life Application of Oracle Primavera Contract Management's Daily Report Module by Don McNatty |
Introduction to Construction Market Surveying |
Integrated Planning & Scheduling for Advanced Technology Projects by Barry Meyers |
Scheduling Best Practices: Beyond the 14 Point Assessment |
Updating and Understanding Project Status in
Phoenix Project Manager
|
Mon 315-335 | Ice Tea & Lemonade Break Proudly Sponsored by ... TBD | ||||||
Mon 335-450 |
Rushed Projects Mistakes Owners Make That Cause
Claims
|
Introduction to Oracle Business Tools |
Project Planning – Then Scheduling by Ted Douglas |
How to Deal with a Contractor’s Schedule that Cannot be
Approved by Chris Carson |
The Great Divorce: Cost Loaded Schedule Updating by John Orr |
Developing Low Cost Earned Value Performance Management Micro Planner X-Pert |
The Shard Of Glass and London Bridge Quarter
Virtual Construction Model Synchro Professional |
Mon 500-600 | Practical Use of Earned Value for Real-time Forecast and Control | OPSIG Oracle Primavera Special Interest Group Networking Event |
MPUG Microsoft User Group Networking Event |
Planning & Scheduling Networking Event Sponsored by AACE |
TPG PMCS Enterprise 2010 |
A demonstration of P6 R8 on YOUR LAPTOP using Critigen's hosting service | |
Mon 600-645 | Carnival Fare Dinner - Hot Dogs, Soft Pretzels, Popcorn, Hot Chocolate - Sponsored by ARES Corporation | ||||||
Mon 700-830 | Special Entry to EPCOT for all Conference Attendees (and paid companion attendees) - Sponsored by Autodesk | ||||||
Mon 830-930 | Dessert & Fireworks Networking Reception at Epcot® IllumiNations Reflections of Earth - Sponsored by Autodesk | ||||||
January 24 TUESDAY |
Swan Salon 6 or as noted |
Swan Salon 5 or as noted |
Osprey 1 | Osprey 2 | Mockingbird 1 | Toucan 1 | Toucan 2 |
Tue 630-900 | Registration at Conference Main Registration Desk 6am - 6pm, at Macaw 1 Conference Office off hours (call posted phone number) | ||||||
Tue630-800 | Swan 7 - 10 - Breakfast is Being Served - Proudly Sponsored by Autodesk | ||||||
Tue 630-350 | Exhibit Tables, AACE Bookstore, and Internet Cafe are Open | ||||||
Tue 800-915 |
When Things Go Wrogn The Business of a Claims Firm by Rocco Vespe, P.E., F.CMAA Hill International, Inc. |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
Ready Room and Green Room for Speakers |
|
Tue 915-945 | Coffee Break Proudly Sponsored by ... TBD | ||||||
Tue 945-1100 |
Jim Zack on CLAIMS Time Extension Requests – A Checklist |
Oracle's
Primavera P6 Tips & Tricks |
Was the Project Really Late? An Introduction to Schedule Risk Analysis by Tony Welsh |
BIM and CPM – World Class Planning Requires
World Class Communication
|
The CPM Schedule is not always an accurate reflection of the Construction Plan | Conversion and Comparison of Microsoft Project to and from Oracle Primavera P6 |
Bringing the Power of Cloud-Based Collaboration
to Project Scheduling |
Tue 945-400 |
Oracle Primavera One-on-One Clinic Macaw 2 - Sign up for your 25 minute session with a Primavera Oracle Specialist |
||||||
Tue 1100-1110 | Free Float | ||||||
Tue1110-1225 |
Jones Day on Preparing for the Trial |
The Care & Feeding of P6 Databases by Ron Winter |
Oracle Primavera Contract Management |
Virtual Construction Models with Bentley Systems ConstructSim |
Submitting Contractor Schedules
in a Hosted P6 Professional DOT Environment
|
Marrying the Financial World with the Project World |
Differentiating Between Activities and Work = Resource Optimization |
Tue 1225-1245 | Swan 7 - 10 - visit our exhibitors - pick up your box lunches | ||||||
Tue 1245-135 |
Mock Trial Luncheon Theatre |
Oracle Primavera P6 System Administrator Tips & Tricks |
Document Management Technology by MySmartPlans |
Choosing the Right Tool for the Job |
Innovations in EVM Systems Best Practices for Integrating Cost and Schedule by EcoSys |
Forecast Scheduling with Microsoft Project 2010 by Eric Uyttewaal, PMP |
Your project is not an island: Introduction to project management integration |
Tue 140-230 |
Oracle's
Primavera Contract Management System Administrator Tips & Tricks |
Showcase of Procore at GE |
4D Planning and Analysis with Autodesk Navisworks | Introduction to EcoSys EPC | Key Differences of Asta Powerproject | Using P6 as a Standalone EVMS | |
Tue 230-245 | Final Break Proudly Sponsored by Proudly Sponsored by ... TBD | ||||||
Tue 245-400 | Mock Trial Recap by Judge John Marshall |
Oracle's Primavera P6 TBD |
Managing Oracle Primavera Contract Management |
Virtual Construction Modeling BIM for Delivery by Synchro |
Available |
Microsoft Project 2010 User Forum |
Available |
Tue 400-1000 | Purchase your After 4pm to Disney Park tickets in advance | ||||||
Tue 400-415 | SEE YOU NEXT YEAR - or extend your stay for our BONUS day | ||||||
Tue 415-1000 |
Conference Office will remain open until 10pm |
Vendor (space available to 10pm) |
Vendor User Forum (space available to 10pm) |
Synchro First Annual Users Meeting Welcome Reception |
Conference Exhibitor Break Down and Clearing (all Exhibitors must vacate by 5pm) | ||
Tue 630-1000 | Dine on Your Own - or - Dine with Your Five New Friends™ | ||||||
Tue 9-Midnite | 2nd Smoke & Mirrors Reception - Dolphin Cigar Bar - Sponsored by Schedule Analyzer Software | ||||||
January 25 WEDNESDAY | Macaw 1 | Macaw 2 | Osprey 1 | Osprey 2 | |||
Wed 630-930 | Macaw 2 & Osprey Terrace 2 - Breakfast is Being Served - Free to all Conference Attendees | ||||||
Wed 800-500 | AACE CCE/CCC and PSP On-Site Examinations in Macaw 1 | ||||||
Wed 800-915 |
AACE Exams Starting, lunch break and ending times determined by AACE. Separate Pre-Registration and fees set by AACE. For further details, CLICK HERE |
Breakfast 600 to 915 |
Dr. Fred Plotnick on Preparing the Initial CPM |
Synchro First Annual Separate fee - for more info | |||
Wed 930-1045 |
Coffee Break 915 to 930 |
Dr. Fred Plotnick on Updates and Change Orders | |||||
Wed 1100-1215 |
Coffee Refresh Break 1045 to 1100 |
Dr. Fred Plotnick on CLAIMS of Delay & Disruption | |||||
Wed 1215-200 | Lunch Service | Lunch and Networking | |||||
Wed 200-315 |
Farewell Cookie Break 315-330 |
Drafting the 8th Edition of CPM in Construction Management | |||||
Wed 330-500 | |||||||
SEE YOU NEXT YEAR - New Orleans |